• In accordance with construction acceptance specification, temporary restraint is to apply to the expansion joint on pipeline at pressure test after pipe installation.

    管道安装进行压力试验施工验收规范要求要对管道膨胀进行临时约束

    youdao

  • In the case that the Contractor is planned to use existing roads as temporary access roads, the Contractor shall submit respective plan to the Project Project Owner for acceptance.

    如果承包商打算现有道路作为临时道路,那么承包商告知业主方面的计划并得到业主同意。

    youdao

  • In the case that the Contractor is planned to use existing roads as temporary access roads, the Contractor shall submit respective plan to the Project Project Owner for acceptance.

    如果承包商打算现有道路作为临时道路,那么承包商告知业主方面的计划并得到业主同意。