The ramp and bottom areas only applied one coat in crude oil tank, but all fittings, support, pipe and bulkhead should be finished two coat.
货油舱底所有舾装件、支架、管子、纵壁和横舱壁二度全部结束。
Especially, there are many stiffened plates in the hull of jack-up platform, for example the main deck, bulkhead, tank top and bottom plating.
在自升式平台的主船体中这种结构更是大面积的得到应用,其主甲板、舱壁、机械甲板和底板等都是板梁组合结构。
Especially, there are many stiffened plates in the hull of jack-up platform, for example the main deck, bulkhead, tank top and bottom plating.
在自升式平台的主船体中这种结构更是大面积的得到应用,其主甲板、舱壁、机械甲板和底板等都是板梁组合结构。
应用推荐