• This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.

    介绍泰安抽水蓄能电站水库采用的土工膜水平防渗措施及其施工缺陷处理水库初期蓄水中的渗漏情况进行了简要的分析。

    youdao

  • This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.

    介绍泰安抽水蓄能电站水库采用的土工膜水平防渗措施及其施工缺陷处理水库初期蓄水中的渗漏情况进行了简要的分析。