If Party a can 't repair the damaged facilities in two weeks so that Party B can't use the facilities normally, Party B has the right to terminate the contract and Party a must return the deposit.
如甲方未在两周内修复该损坏物,以致乙方无法正常使用房屋设施,乙方有权终止该合约,并要求退还押金。
If Party a can 't repair the damaged facilities in two weeks so that Party B can't use the facilities normally, Party B has the right to terminate the contract and Party a must return the deposit.
如甲方未在两周内修复该损坏物,以致乙方无法正常使用房屋设施,乙方有权终止该合约,并要求退还押金。
应用推荐