• After surveying the operational aspect and production efficiency of the pilot-plant, integrating systemic analyses of the existing plant, the design was modified.

    考察装置运行状况生产效率并结合现有装置分析,改进设计方法

    youdao

  • After surveying the operational aspect and production efficiency of the pilot-plant, integrating systemic analyses of the existing plant, the design was modified.

    考察装置运行状况生产效率并结合现有装置分析,改进设计方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定