The said process has a finished product rate higher than 95% and a sprue and riser head system weight lower than 20 wt% of the casting.
所得铸件的成品率为95%以上,浇冒口系统重量占铸件重量的20%以下。
Compared to the single phase loop, for the given design conditions, the cold storage-heat pump loop radiator area was reduced by 69.9% and the system weight was reduced by 53.5%.
与单相流体回路相比,在给定条件下,采用蓄冷热泵回路可减少辐射器面积69.9%,降低排热系统质量53.5%。
System weight assessment is included in this article. System balance calculation shows that this design is reasonable and feasible.
对系统重量进行了估算,系统平衡计算表明该方案是合理可行的。
System weight assessment is included in this article. System balance calculation shows that this design is reasonable and feasible.
对系统重量进行了估算,系统平衡计算表明该方案是合理可行的。
应用推荐