The land cost should be evaluated and determined in accordance with the category of the projects, location, investment per unit, etc. , implementing the a case-for-case system.
按专案类型、落户地域及单位面积投资额等因素评估确定,实行“一事一议”制度。
Taking New England 10-unit 39-bus system as the case, the power flow transferring is simulated and simulation results show that the proposed wide area backup protection scheme is effective.
对新英格兰10机39节点系统进行了潮流转移的仿真计算,验证了所提出广域后备保护方案的有效性。
Taking New England 10-unit 39-bus system as the case, the power flow transferring is simulated and simulation results show that the proposed wide area backup protection scheme is effective.
对新英格兰10机39节点系统进行了潮流转移的仿真计算,验证了所提出广域后备保护方案的有效性。
应用推荐