However, if the total buffer size is too large, and there is not enough storage to allocate them, a minimum system buffer pool for each page size is allocated, and performance is sharply reduced.
但是,如果总的缓冲区大小太大,并且没有足够的存储器可用来分配给它们,那么将为每种页大小分配最少的缓冲池,性能就会急剧下降。
The powerful system has the capacity to propel thousands of gallons of water a minute throughout a reactor pressure vessel and storage pool.
这种强力的系统有能力在一分钟内驱动上千加仑的水流经反应堆的高压容器和储存池。
Zpool create tank command tells the file system to build and format some drives, and label this storage pool as tank.
Zpool createtank命令会判断要构建的文件系统,对一些驱动器进行格式化,并将此存储池标记为tank。
The output shows that storage pool of the file Confidential-Development.txt is now changed to system while that of the file Confidential-Report.doc is still secret.
输出结果显示Confidential-Development.txt文件的存储池改为system,而 Confidential-Report.doc 文件的存储池仍然是 secret。
Virtual storage pool makes users acquire data from storage server's network channels synchronously, which shortens server's response time hugely and improves system average transmission rate.
虚拟存储池实现了存储服务器网络通道的并行数据传输,极大地提高了系统的平均数传率。
A computer system includes at least two backup servers, each backup server included in a single - instance storage pool.
计算机系统包括至少两个备份服务器,每个备份服务器包括在单一实例存储池中。
This paper, based on the theory of jet fluidics, had quested for the feasibility of utilizing the fire pool for cold storage air conditioning system.
本文从射流理论出发,探索利用消防水池进行蓄冷空调的可能性问题。
Puts forward a way to use the fire pool in high buildings as a water cool storage system. Proposes a design calculation method, measures for saving energy and an economic benefit analysis.
提出将闲置的消防水池用于空调蓄冷的方案,给出计算方法、提高热效率的措施和经济效益分析。
The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后,只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。
The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后,只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。
应用推荐