During the Transition phase, the project might need to integrate the rollout and patching of the new system with the ongoing maintenance of the old system.
在产品化阶段,这个项目可能需要将新系统于原有的其他系统进行整合。
This is enabled in the Renderer "s System Options rollout, Miscellaneous group (where flat z-buffer, etc. are located)."
这是启用的转译器“s系统选项部署,杂项组(如平面的Z轴缓冲等设)。”
This is enabled in the Renderer "s System Options rollout, Miscellaneous group (where flat z-buffer, etc. are located)."
这是启用的转译器“s系统选项部署,杂项组(如平面的Z轴缓冲等设)。”
应用推荐