Hot switching may be required when the interval from when power is applied to the point when the measurement is made must be closely controlled.
当必须严格控制从施加电压到进行测量之间的时间间隔时,就需要采用热切换。
A numerical simulation was conducted to optimize the well placement, well patterns and spacing, horizontal interval length, timing of switching to SAGD and operating parameters.
利用数值模拟优选了布井方式、井网井距、水平井段长度、转sagd时机和注采参数。
A numerical simulation was conducted to optimize the well placement, well patterns and spacing, horizontal interval length, timing of switching to SAGD and operating parameters.
利用数值模拟优选了布井方式、井网井距、水平井段长度、转sagd时机和注采参数。
应用推荐