• Hot switching may be required when the interval from when power is applied to the point when the measurement is made must be closely controlled.

    必须严格控制施加电压进行测量之间时间间隔需要采用热切换。

    youdao

  • A numerical simulation was conducted to optimize the well placement, well patterns and spacing, horizontal interval length, timing of switching to SAGD and operating parameters.

    利用数值模拟优选方式井网井距水平井长度、转sagd时机注采参数。

    youdao

  • A numerical simulation was conducted to optimize the well placement, well patterns and spacing, horizontal interval length, timing of switching to SAGD and operating parameters.

    利用数值模拟优选方式井网井距水平井长度、转sagd时机注采参数。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定