The research results were applied in the design of piles of Sutong Yangtze River Bridge to solve the difficulty and to achieve the remarkable economic benefit.
该研究成果直接应用于苏通大桥主桥桩基础设计中,取得了显著的经济效益。
To improve the bearing capacity of piles under Sutong Yangtze River Bridge, different post grouting techniques were adopted to large diameter and super-long piles.
为提高苏通大桥桩基础的承载力,将不同后压浆工艺应用于苏通大桥大直径超长桩中。
Building a bridge in the Yangtze River meant breaking another record-at 120 meters, the Sutong has the deepest foundation of any cable-stayed bridge.
在扬子江上建造桥梁同时也意味着打破了另一项记录:苏通大桥拥有超过任何斜张桥的120米深桥基。
Building a bridge in the Yangtze River meant breaking another record-at 120 meters, the Sutong has the deepest foundation of any cable-stayed bridge.
在扬子江上建造桥梁同时也意味着打破了另一项记录:苏通大桥拥有超过任何斜张桥的120米深桥基。
应用推荐