• Closure cover system is one of important parts of landfill site construction, it includes landfill gas discharge guiding layer, geotechnical film, drainage layer and plant cover surface soil layer.

    封场覆盖系统垃圾卫生填埋场建设重要组成部分,覆盖系统包括气体土工排水层、植被表土层。

    youdao

  • It is difficult to control the hole and the slope during frozen drill in profundity surface soil, this text bring forward some experience of management and construction.

    针对深厚表土层冻结钻孔存在钻孔深、偏斜率控制施工存在问题,提出了一些施工管理经验

    youdao

  • During normal construction process, the friction force between shield and soil exhibited greater influence on surface deformation compared with bulkhead additive thrust.

    正常施工时,盾壳土体之间摩擦力地面变形影响远大正面附加推力

    youdao

  • Considering the features of the construction of this line specific requirements are specified in the filling such as filling with fine earth, coarse mountain surface soil and graded crushed stones.

    结合秦沈线施工特点具体指出路基采用和级配碎石几种具有代表性填料进行填筑技术要求

    youdao

  • For three kinds of different soil layer construction, the characters of the platform values and the characteristic periods of ground surface acceleration response spectra were studied.

    系统研究了软夹层在底部、中部顶部土层结构反应平台特征周期的主要特征。

    youdao

  • The working principle and the influences of construction parameters of the soil opener on the length and the width of soil hole formed by spade on the soil surface were analyzed.

    进而分析了成穴器结构参数打穴铲土壤上所形成长度穴孔宽度影响

    youdao

  • The most pivotal technical problem of building high-speed railway on soft soil is strictly controlling post-construction settlement of subgrade and its elastic deformation of top surface.

    土地修建高速铁路关键技术问题就是严格控制路基的沉降列车高速运行时路基面的弹性变形

    youdao

  • Earth pressure balance (EPB) shield construction often has soil-compacting effects on its surrounding soil. It results in the surface upheaval and moving away of deep soil from the tunnels.

    平衡施工通常周围土体产生挤压作用导致地面隆起深层土体远离隧道方向移动

    youdao

  • It can be used for construction of road bed and slop, digging channel, mixing the road surface compound, cleaning snow, transporting the grit material and maintaining the soil and metal road.

    动作灵活准确,操纵方便,平整场地较高的精度,适用于构筑路基路面、修筑边坡开挖,也可搅拌路面混合料扫除积雪推送物料以及进行土路和碎石路的养护工作。

    youdao

  • It can be used for construction of road bed and slop, digging channel, mixing the road surface compound, cleaning snow, transporting the grit material and maintaining the soil and metal road.

    动作灵活准确,操纵方便,平整场地较高的精度,适用于构筑路基路面、修筑边坡开挖,也可搅拌路面混合料扫除积雪推送物料以及进行土路和碎石路的养护工作。

    youdao