• The relations between the time of surface drying and the quantity of curing agent was established.

    测定了固化剂用量与涂膜表干时间的关系,表干时间随固化剂用量的增多而减短。

    youdao

  • Remove all remaining dust and debris by dry sweeping and then vacuum cleaning after concrete surface drying.

    混凝土表面干燥后,先用扫帚扫去地表残留灰尘和杂物,然后用真空吸尘器进一步清洁表面。

    youdao

  • Film properties including surface drying time, luster value, shock strength, adhesion and flexibility were tested according to standard methods for coating.

    同时用涂料标准方法测定了这些样品的漆膜的表干时间、光泽值、冲击强度、附着力、柔韧性等。

    youdao

  • Film properties including surface drying time, luster value, shock strength, adhesion and flexibility were tested according to standard methods for coating.

    同时用涂料标准方法测定了这些样品的漆膜的表干时间、光泽值、冲击强度、附着力、柔韧性等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定