• The storm's violent waves would have caused separate pieces floating even briefly on the surface to drift apart.

    风暴猛烈海浪使漂浮海面碎片漂流分离。

    youdao

  • One of a series of short scars made by glacial DRIFT on a surface of bedrock.

    冰川漂流物基岩表面留下一系列之一

    youdao

  • The dielectric barrier surface discharge process is simulated using Poisson's equation and drift-diffusion equation and the distribution history of electron, ion and electric field is gained.

    采用方程漂移-扩散方程介质阻隔放电进行数值模拟,得到了电子离子以及电场分布随时间变化。

    youdao

  • Under high velocity flow conditions, cascade losses are mainly caused by radial drift of the boundary layer along the suction surface and by blade wakes.

    高速流动条件下叶栅损失主要是吸力边界层径向串流及其尾迹

    youdao

  • Single-beam surface photovoltage spectrum (SPS) apparatus can not avoid the error caused by the drift of light source intensity with time .

    单光束表面光电压,当光源强度时间发生漂移时,必然产生结果误差

    youdao

  • Minute organisms that float or drift passively near the surface of oceans and seas.

    洋面海面附近浮动被动漂浮的微小生物

    youdao

  • Coal mining in remote mountainous district mainly on drift of coalpit, and its influence on surface deformation has already been attention.

    偏远山区矿山开采多以小窑掘进为主地表变形影响引起人们的重视。

    youdao

  • The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.

    介绍北京地铁5线磁器口车站埋暗挖隧道施工技术,对地表监测数据进行了分析

    youdao

  • The boundary layer flow control using dielectric barrier surface discharge plasma is simulated using Poisson's equation, drift-diffusion model and N-S equations.

    使用方程漂移扩散模型和N—S方程对介质阻隔放电等离子控制边界层流动进行了一体化数值模拟。

    youdao

  • Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.

    福州961人防工程乌山主通道工程施工中采用中洞先行施工方法地控制了地表变形,保证了地表建筑物的正常使用。

    youdao

  • Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.

    福州961人防工程乌山主通道工程施工中采用中洞先行施工方法地控制了地表变形,保证了地表建筑物的正常使用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定