• For example, switching logic can be defined to have the return fan start after a programmed delay from the time that the supply fan was started.

    比如切换逻辑可以用来定义一个风机开起程序定时过后,风机起动。

    youdao

  • In the water supply process, the turnover temperature of the PCM appeared two minutes later than the water temperature on the height, which indicates that the PCM has the features of time delay.

    放热过程中,蓄热材料温度变化拐点高度水温拐点值出现2分钟说明相变蓄热材料具有延时性。

    youdao

  • In the water supply process, the turnover temperature of the PCM appeared two minutes later than the water temperature on the height, which indicates that the PCM has the features of time delay.

    放热过程中,蓄热材料温度变化拐点高度水温拐点值出现2分钟说明相变蓄热材料具有延时性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定