This paper cutter suction dredger construction of the main analog interface design.
本文主要对绞吸挖泥船施工模拟的主界面进行了设计。
Cutter-suction dredger looses the soil to mix with the water by cutter, and pumps the mud by dredge pump.
绞吸挖泥船是利用绞刀松动泥土,使之与水混合,而后用泥泵将泥浆泵出的挖泥船。
This paper mainly study the influence of wave alternating load on the strength of cutter suction dredger spud.
本文主要研究波浪交变载荷对挖泥船定位桩疲劳强度的影响。
Into the fourth on how to design cutter suction dredger construction simulation system for the entire process of the main interface.
第四局部为引见若何设计绞吸挖泥船施工模仿系统主界面的全过程。
A cutter suction dredger is a kind of dredger commonly used in dredging. One of its key devices is the cutterhead used to cut soils under water.
绞吸式挖泥船是一种常用的清淤疏浚工具,其核心部件之一是挖掘水下土质的绞刀。
Suction Dredger: it is special mud disposal equipment designed for flat flow sedimentary pond, sewage disposal project, and secondary flat flow sedimentary pond.
吸泥机是给水工程中平流式沉淀池和污水处理工程中,二次平流式沉淀池等专用排泥设备。
The core technology of cutter-suction dredger is to determine the pump running parameters according to construction conditions and determine the production capacity.
绞吸船的核心技术是根据施工条件确定泥泵的运转参数,由此决定了绞吸船的生产能力。
Aiming at the features of "Xinhaijing" drag suction dredger, this article analyzes the design of dredging machinery for the project of "cargo ship conversion to dredger".
文章主要针对“新海鲸”号耙吸挖泥船的特点,对“货改耙”疏浚机械系统设计作简要分析介绍。
Thus, the foundation for the further research on overflow loss transforming regulation and the stocking time optimization applied on drag suction dredger has been set up.
这样就为进一步研究溢流损失的变化规律,并应用于耙吸船装舱时间的优化奠定了基础。
With this method, the soil is dumped into a pit, which has been dredged previously, and is dumped up by a plain suction dredger. This dredger then pumps it ashore through a floating and fixed pipe.
使用这种方法时,先将淤泥倒入事先挖好的坑中,然后使用吸泥机,通过漂浮在水中、并加以固定的管道将淤泥吸到岸上。
Based on the sequential quadratic programming method, a thrust allocation for the trailing suction hopper dredger was presented.
以序列二次规划法为理论基础,提出一种针对耙吸式挖泥船的推力分配方案。
Based on the sequential quadratic programming method, a thrust allocation for the trailing suction hopper dredger was presented.
以序列二次规划法为理论基础,提出一种针对耙吸式挖泥船的推力分配方案。
应用推荐