However, with the same project team, subsequent projects will be much smoother.
然而,对于同样的项目团队,后继的项目将更容易。
During subsequent project phases, further validation and development of the project scope for that phase is performed.
随后在各项目阶段,要进一步审核和细化本阶段的项目范围。
The Danjiangkou reservoir is one of the built large-scale reservoirs at home, its subsequent project is the headstream for south-to-north water diversion project.
丹江口水库是我国已建成的最大水库之一,其续建工程是我国跨世纪宏伟工程-南水北调的源头。
At any time, you can continue working on the solution information project and export subsequent snapshots of it.
在任何时候,都可以继续处理解决方案信息项目并导出它的后续屏幕快照。
Aside from the book project suit and subsequent delays, he may not have really grappled with too many obstacles — until now.
除了图书数字项目诉讼和随后的延期,他还没有能够真正克服太多的障碍——直到现在。
This article and subsequent articles will describe how to establish appropriate measurements to determine if the project is on track to achieving these goals.
这篇文章以及后续的文章都将讨论如何建立合适的度量来确定这个项目是否正常运行,并达到这些目标。
Assuming the project survives, BPI-level project managers work with managers for individual subsystems to make subsequent planning and design changes that accommodate the business change.
假设这个项目还存在,BPI级别的项目管理者同各自子系统的管理者一起去指定随后的计划并构思设计适合于商业改变的相应改动。
It may be as simple as an email approval but you need to get it in writing that the new feature is being added to the project and the subsequent impact that will have on the schedule and budget.
变更流程可能像批复邮件一样简单,但是你有必要记录下来:新特性加入到了项目中、它对进度和预算将产生怎样的影响。
In the subsequent panel, verify that the WForecast Web project is identified and click Next.
在后续的面板中,请验证WForecastWeb项目被标识,然后单击Next。
To create a source folder, right-click the sametimebot project and from the subsequent context menu, select New - source folder.
要创建源文件夹,右键单击sametimebot项目,在随后出现的上下文菜单中选择new-Source Folder。
Also, select Set server as project default to avoid this prompt on subsequent tests.
同时选择Setserverasprojectdefault以避免在随后的测试中出现这一提示。
How to work with these measures in the subsequent phases of the project will be the topic of subsequent articles.
在此项目接下来的阶段中如何利用这些度量将是后面文章的话题。
In a subsequent presentation, limited to three minutes per project, each demo is shown to the whole team.
在随后每个项目限制在三分钟内的陈述上每个演示展示给整个团队。
The first lesson details how to unzip and import the project that contains the UML models that will be used in the subsequent lessons.
第一章详细说明了如何解压和导入那个包含着UML,并且将应用在随后章节中的模型的项目。
As deadlines near, the project leaders must continually assess the amount of unfinished work and determine if work should slip to the subsequent release.
随着工作期限的迫近,项目经理必须不断地评估还为完成工作地数量,并决定工作是否要直接跳转到接下来地发布。
Project Analysis Sessions often help to define assignments for subsequent three or five day panels.
项目分析会议,通常帮助确定随后三天或五天顾问团任务。
In the subsequent articles in this series, we will explain how to modify the stream from repository workspaces and then deliver it to the Project Area.
在这个系列后面的文章中,我们将解释如何从工作空间修改这个流程,并将它交付给Project Area。
The subsequent pages and portlets follow a specific format that is beneficial for project team member use.
后面的页面和portlet遵守有益于项目团队成员使用的特定格式。
Land reclamation planning is the key of the whole Land reclamation project, and also foundations of subsequent works.
土地复垦规划是整个土地复垦工程的关键,也是进行后续工作的基础和直接理论依据。
With the pilot scheme slated to begin in 2016, subsequent phases of the project could see in excess of 40 droneports built across Rwanda.
试点计划将于2016年开始,该项目后续会在卢旺达全国陆续建起40多个无人机机场。
During subsequent phases of multi-phase projects, the Develop project charter process validates the decisions made during the original chartering of the project.
在多阶段项目的以后各阶段,制定项目章程过程的作用是验证原来为项目制定与颁发章程所做的各种决定。
Then you compare the schema of each subsequent database with the schema of the project and specify which objects you want to import.
然后,将每个后续数据库的架构与项目架构进行比较,并指定要导入的对象。
A thorough assessment of the size of the project is crucial for its subsequent execution as it enables us to plan all the stages for all the components such as audio, graphics or text.
全面评估项目规模对后续的执行至关重要,因为它可以使我们为所有的组件(例如语音、图形或文本)计划全部的阶段。
Merge other databases into the project: You can compare the schema of a subsequent source database to the schema of the database project.
将其他数据库合并到项目中:您可以将后续源数据库的架构与数据库项目的架构进行比较。
Once entered, these Settings are stored in the project Property Pages, so you will not need to enter them again for subsequent debugging sessions.
输入后,这些设置存储在“属性页”项目中,因此在以后的调试会话中不必再输入这些设置。
Moving lots of dirt and installing the subsequent drainage system are major line-item costs in a typical golf course construction project.
这里是我指出的成本上升的另一个方面:土方与排水是一个球场建造项目中主要的成本。
Moving lots of dirt and installing the subsequent drainage system are major line-item costs in a typical golf course construction project.
这里是我指出的成本上升的另一个方面:土方与排水是一个球场建造项目中主要的成本。
应用推荐