Dynamic stress is distributed as saddle along the lateral direction of subgrade surface. Dynamic stress along the depth declines sharply.
路基面动应力在横向呈马鞍分布,动应力沿深度方向衰减较快。
By dewatering of foundation pit, the points above the drainage layer all have a considerable influence and the shorter distance with the subgrade surface the more influence.
但随着基坑降水的进行,排水层以上各点均受较大影响,并且距离路基表面越近影响越大。
The drainage design of urban highway deals with only the surface run-off. It presents a new drainage system considering the road surface, pavement structure, and subgrade (including green belt).
城市快速路排水设计,一般只考虑路面径流的做法,主要从道路表面、路面结构内部和路基(包括绿化带)三方面时排水进行综合介绍。
The most pivotal technical problem of building high-speed railway on soft soil is strictly controlling post-construction settlement of subgrade and its elastic deformation of top surface.
在软土地基上修建高速铁路,其最关键的技术问题就是严格控制路基的工后沉降及列车高速运行时路基顶面的弹性变形。
Subgrade slope surface erosion is defined as a phenomenon which rain runoff destroys subgrade slope surface, and washes away soil on the surface of slope.
路基边坡冲刷是指降雨形成的坡面水流破坏路基边坡坡面,并冲走坡面表层土体的现象。
Based on the collapsible loess subgrade in China northern region, this paper used dynamic sounding method and surface wave method to detect the impact compaction behavior.
基于中国北方某湿陷性黄土路基工程,利用动力触探和面波法等方法对冲击压实工后的黄土路基进行对比检测。
Based on the author's years of supervising work experience for municipal concrete road, the article will focus on quality control essentials during the construction of road bed, subgrade and surface.
文章结合作者多年监理工作经验介绍市政混凝土道路施工阶段对路床、基层、面层质量监理控制要点。
Subgrade and foundation engineering is a kind of concealed work, which is located under the ground surface.
地基与基础位于地面以下,属于隐蔽工程。
Using the latter, with the correlativity of soil 'density and the velocity of the Rayleigh surface wave, we can obtain the compaction of the subgrade.
后者则是用已得到的各层瑞雷波速度值,利用土密度与瑞雷波速的相关关系计算各层的压实度。
When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
填土路基分段作业时,先施工路段端部必须留不陡于1:5的坡面,坡面必须整平压实,以便施工机械上下及下段路基施工时开台阶。
When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
填土路基分段作业时,先施工路段端部必须留不陡于1:5的坡面,坡面必须整平压实,以便施工机械上下及下段路基施工时开台阶。
应用推荐