• In this paper probability analysis method is introduced in the study on earthquake risk for the dam of the project. Comparison with conventional deterministic method has been conducted.

    本文概率分析方法引用水电站大坝地震危险性研究,并常规确定性方法进行比较

    youdao

  • In this paper probability analysis method is introduced in the study on earthquake risk for the dam of the project. Comparison with conventional deterministic method has been conducted.

    本文概率分析方法引用水电站大坝地震危险性研究,并常规确定性方法进行比较

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定