• In this paper measured data and curves obtained by testing full scale suspension insulator string and jumper wire in large wind tunnel are introduced.

    本文介绍了在风洞中所作的悬垂绝缘子串和跳线的风偏试验以及所测得的数据和曲线。

    youdao

  • Test and research result shows that the retrofit of backward V insulators can be carried out for 500 kV suspension insulator string, and when it is .

    火力发电厂及变电所中悬垂绝缘子串片数的选择是电气设计中必须的步骤和容易产生混乱的难点,因此本文对此进行了研究。

    youdao

  • When a drill string moves upward or downward in a well, significant stress variations at the suspension point are caused by the starting and stopping of the motion.

    钻柱在上提、下放的开始和终了悬点的应力要发生很大变化,其中以上提过程的终了时变化最大。悬点的应力变化产生速度波和应力波沿钻杆向下传递。

    youdao

  • When a drill string moves upward or downward in a well, significant stress variations at the suspension point are caused by the starting and stopping of the motion.

    钻柱在上提、下放的开始和终了悬点的应力要发生很大变化,其中以上提过程的终了时变化最大。悬点的应力变化产生速度波和应力波沿钻杆向下传递。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定