• The Contractor shall give notice to the Engineer whenever any work is ready and before it is covered up, put out of sight, or packaged for storage or transport.

    覆盖、掩蔽包装以备储运或运输之前无论何时,当此类工作准备就绪,承包商及时通知工程师

    youdao

  • The drifting rack is used for the storage of assembly line position. The materials slide down upon its own gravity, the bevel accessing for materials is more suitable for human engineer design.

    流利式货架适用生产线共位存放物料箱靠重力沿滚轮下滑,物料斜面存取符合人体工程设计

    youdao

  • The drifting rack is used for the storage of assembly line position. The materials slide down upon its own gravity, the bevel accessing for materials is more suitable for human engineer design.

    流利式货架适用生产线共位存放物料箱靠重力沿滚轮下滑,物料斜面存取符合人体工程设计

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定