• Gradually, however, there are fewer stoppages and fewer problems.

    然而,逐渐地停工越来越少,问题也越来越少。

    youdao

  • You can reduce line stoppages and replenish needed materials to the production line.

    您可以减少生产线停工的情况,并向生产线及时补充所需材料。

    youdao

  • Production delays or stoppages are common in the electronics and automotive industry.

    在电子产品业及汽车业界,延迟生产或停产都是非常普遍的。

    youdao

  • This is a critical distinction from the classic assembly-line process, where stoppages are expensive and to be avoided at all costs.

    这是与传统生产线流程的主要区别。 传统生产线流程中,停工代价是非常昂贵的,因而无论如何都要避免停工。

    youdao

  • This week Saab’s assembly line in Trollhattan suffered the latest in a series of stoppages because unpaid suppliers had halted shipments of parts and materials.

    本周,由于货款被拖欠,部件及材料供应商们已暂停供货,这迫使位于特洛拉坦的萨博组装线开始了新一轮的停工。

    youdao

  • The elevator stoppages have led to even longer lines.

    而电梯停工使队伍变得更长。

    youdao

  • The symptoms are seemingly random stoppages in production and premature failures in the electronics.

    表面上看来,这些症状可以是生产流程不定时停止,也可以是电子元件过早出现故障。

    youdao

  • Owing to the recurrent stoppages of work through the air raids, arrears had accumulated in the cipher branch .

    由于在空袭中工作屡屡停顿,密码部门积压了许多未译的电报。

    youdao

  • This week Saab's assembly line in Trollhattan suffered the latest in a series of stoppages because unpaid suppliers had halted shipments of parts and materials.

    本周,由于货款被拖欠,部件及材料供应商们已暂停供货,这迫使位于特洛拉坦的萨博组装线开始了新一轮的停工。

    youdao

  • It was in a splendid street very near the top of the city (the Tisroc's palace was the only thing above it) that the most disastrous of these stoppages occurred.

    在离山顶很近的一条华丽的街上(唯一胜过这条街的,便是蒂斯·罗克的王宫了),最倒霉的事发生了。

    youdao

  • If the employer fails to inspect the same in a timely manner, the contractor may appropriately extend the project period and is entitled to claim damages for work stoppages, work delays, etc.

    发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。

    youdao

  • If the employer fails to inspect the same in a timely manner, the contractor may appropriately extend the project period and is entitled to claim damages for work stoppages, work delays, etc.

    发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定