• The geological conditions of Jiaojia Gold Mine are introduced, the types of engineering rock mass are classified and the methods of stope support are evaluated.

    介绍家金矿床赋存地质条件划分工程岩体类型,介绍评价了矿山近年来应用的支护方法

    youdao

  • In open stopes the ground above the stope will support its own weight. So the stope is shaped like a series of rooms divided by walls or supported by pillars of ore.

    空场回采工作面利用采场上方岩层支撑自身重量所以采场被切割一系列分隔矿柱支撑的峒

    youdao

  • Finally, support control measures were taken to ensure the stope stability.

    最后提出控制采场稳定性支护对策。

    youdao

  • The technology and practice of artifical pumpcrete pillar support is briefly introduced in this paper. The mining test was carried out using the pillars, at 2364 stope of Woxi mining district.

    介绍了泵送混凝土人工支护工艺,并对该工艺进行了一系列可操作性试验湘西金矿沃溪矿区2364采场进行了采矿试验。

    youdao

  • The technology and practice of artifical pumpcrete pillar support is briefly introduced in this paper. The mining test was carried out using the pillars, at 2364 stope of Woxi mining district.

    介绍了泵送混凝土人工支护工艺,并对该工艺进行了一系列可操作性试验湘西金矿沃溪矿区2364采场进行了采矿试验。

    youdao