Traditionally, the integral casted stern post is positioned according to engine′s axes after completing subassembly on the berth. This technology is executed difficultly and needs large berth period.
整体浇铸的尾柱采用传统的在总装线船台上待分段合拢后,再拉主机轴线定位安装的方法施工难度大、船台周期长。
My apologies if this post sounds very stern, but YOUR SAFETY online is OUR main priority.
如果这贴听起来太严厉了,我很抱歉,但你在网路上的安全是我们最优先考虑的问题。
About the 15th of May the keel of the new vessel lay along the dockyard, and soon the stem and stern-post, mortised at each of its extremities, rose almost perpendicularly.
5月15日前后,新船的龙骨已经搁在造船所了;不久,船首材和船尾材也已用榫头分别接在龙骨的两头,几乎直立起来。
About the 15th of May the keel of the new vessel lay along the dockyard, and soon the stem and stern-post, mortised at each of its extremities, rose almost perpendicularly.
5月15日前后,新船的龙骨已经搁在造船所了;不久,船首材和船尾材也已用榫头分别接在龙骨的两头,几乎直立起来。
应用推荐