Use-Case analysis step 8: Qualify analysis mechanisms.
用例分析第八步:验证分析机制。
The write throughput to the physical storage device (step 8).
写到物理存储设备(步骤8)的写吞吐量。
Notice in step 8 of Figure 3 that a FAILURE signal is sent back to the controller.
注意图3的步骤8中FAILURE信号被发送回控制器中。
When step 8 above is complete, an Eclipse project is created containing the code in the apps module of the Apache Wink examples.
步骤8完成后,将创建一个Eclipse项目,它包含ApacheWink示例的apps模块中的代码。
In the dependency Selection window, look for the Dojo dependency (shown at the top of the list in Figure 3), and if present, go to step 8.
在DependencySelection窗口中,查找Dojo依赖项(如图3中列表的顶部所示);如果找到该依赖项,则转到第8步。
It shows step 8 which is the summary of the wizard, with all default values, and the default button is the Finish button for running the actual task.
它展示步骤8,即向导的汇总页,含有所有默认选项,且默认按钮是用于运行实际任务的Finish按钮。
Step 8. Edit webseald.conf file
步骤8.编辑webseald.conf文件
Step 8: Generate a project plan.
步骤八:生成一个项目计划。
Step 8: Make friends at the gym.
步骤8:多交朋友。
Step 8: Set up the cluster again.
步骤8:重新设置集群。
Step 8: Identify Run-time patterns
第 8步:识别运行时模式
Step 8: Adding Another Native Function
第 8步:添加另一个原生函数
Step 8: Telnet/deploy on WAS and restart
步骤8:WAS上的远程登陆/部署和重新启动
Extending the Configured Model (Step 8-9).
扩展配置的模型(步骤8 - 9)。
Step 8 - Creating required groups and users.
步骤8-创建所需的组和用户。
Step 8 copies the public key to the remote computer.
步骤8 将公钥复制到远程计算机。
When you finish filling out new pages, go to Step 8.
做好新的内容页了以后,请转到第8步。
Step 8: Configure Service Registry with the life cycle.
步骤8:使用生命周期配置Serviceregistry。
Step 8. Creating an ext2 file system on the new partition.
在新的分区上创建一个ext2文件系统。
Step 8: Business Activity checks which tasks have completed.
第8步:业务活动检查哪些任务已经完成。
Step 8 - Create replication control tables for the Apply program
步骤8-为Apply程序创建复制控制表
Restore the deployment manager configuration you backed up in Step 8.
恢复您在步骤8中备份的部署管理器配置。
Step 8: Integrate the patterns and any packages selected into the solution.
步骤8:将这些模式和所选的任何包集成进解决方案中。
Refer to Option 1 Step 8 on how to use ifxclone utility to re-set up RSS and HDR.
参阅选项1 -步骤8了解如何使用ifxclone实用工具来重新设置RSS和HDR。
Step 8: Apply the opposite diagonal motion blur to the other Star Diffusion layer.
第八步:在另一个星光柔化图层上使用相反对角线的动态模糊效果。
Now I again check to see if the 8-byte parity-fixed block of Step 10 is a weak key (just like I did in Step 8).
现在再次检查第10步得到的经过奇偶修正的8字节块是不是弱密钥(就像在第8步中所做的那样)。
For example, in Step 8, the RentalLocation is asked to meet its responsibility of determining what vehicles are available.
例如,在第八步中,租借地点要决定在这个地点,哪些汽车是可用的。
Step 8: the second JBI environment receives the request and forwards it to the BC connected with the first JBI environment.
第8步:第二个JBI环境接收请求,并将它发送到连接第一个JBI环境的BC。
Suppose that the Update software stack scenario was not to include Step 8 anymore, as a consequence of a change in the process.
假设由于过程中的变更更新软件栈(Update software stack)场景将不再包含步骤8。
Refer to Option 1 Step-8 on how to use ifxclone utility to re-set up RSS and HDR.
参阅选项1 - 步骤 8 了解如何使用ifxclone实用工具来重新设置RSS和HDR。
应用推荐