Problems occurred in commissioning of gas-steam combination circulation generating unit(CCPP) and the problems had an effect on the whole gas system.
针对鞍钢燃气蒸汽联合循环发电机组(CCPP)在调试投产过程中出现的问题及对整个煤气系统的影响,采取一系列应对措施解决了问题。
A wet steam experiment system is established with a Laval nozzle generating wet steam.
构建了湿蒸汽实验系统并进行了蒸汽湿度测量的实验研究。
From the stability and the safety of generating system, the urgent cease control loop of the steam turbine was reformed.
从确保发电系统的稳定性和安全性出发,对原发电系统中汽轮机的紧急停机控制电路进行了改造。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。