DMB-T has passed the phase of Project Demonstration, system simulation, Re search of Functional system, IC chips and STB product. After several kinds of lab.
标准方案历经了方案论证、系统仿真、样机研究、IC流片和产品机顶盒样机开发等多个研发阶段。
The method is also applicable in other systems such as DVB-C STB and DVB-T STB, etc, and is significative for developments in those systems mentioned above.
这种应用方法同样适用于DVB-C以及DVB-T等其他嵌入式系统,对其他嵌入式系统中数据存储的开发有一定指导作用。
The method is also applicable in other systems such as DVB-C STB and DVB-T STB, etc, and is significative for developments in those systems mentioned above.
这种应用方法同样适用于DVB-C以及DVB-T等其他嵌入式系统,对其他嵌入式系统中数据存储的开发有一定指导作用。
应用推荐