We are going to build the largest cable stayed bridge in the nation here.
我们这里将新建一座全国最大规模的斜拉桥。
Long span cable-stayed bridge is one of the most important modem bridge types.
大跨度斜拉桥是现代桥梁最具竞争力的桥型之一。
Cable-stayed bridge is a sort of antiquity again young cable bearing structure.
斜拉桥是一种古老而又年轻的缆索承重结构。
Cable-stayed bridge and stayed cable are obviously geometrically nonlinear structures.
斜拉桥和斜拉索是几何非线性明显的结构。
The importance of cable force adjustment for cable-stayed bridge construction control is discussed.
论述了索力调整在斜拉桥施工控制中的重要性。
Binzhou Yellow River bridge is a three-tower cable-stayed bridge with prestressed concrete girders.
滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。
The informations are reference for the design and construction of the similar PC cable-stayed bridge.
简要介绍了五河口预应力混凝土斜拉桥双边箱主梁的设计与施工。
It is believed that the crossing will form the world's longest single-tower, asymmetric cable-stayed bridge.
据说,它将成为世界上最长的单塔不对称斜拉桥。
Finally, the construction control of cable-stayed bridge based on BP neural networks is discussed and analyzed.
最后,本文对基于BP神经网络的斜拉桥施工控制进行了探讨。
This program make the construction control analysis of cable-stayed bridge become more convenience at any time.
从而可以更方便、快捷地对斜拉桥施工进行分析计算。
A new type of vicious shear damper used in the cable stayed bridge is introduced and its design method is given.
介绍一种新型的斜拉桥拉索用粘性剪切型阻尼器,并给出了该阻尼器的设计原理和方法。
The multi-scale damage analysis method for steel box girder is presented with respect to Runyang Cable-stayed Bridge.
以润扬大桥斜拉桥为分析对象,提出了扁平钢箱梁结构的多尺度损伤分析方法。
The height of the poles is 100 m yet. Soon it will be 320 m. And it will become the world's biggest cable-stayed bridge.
目前桥两端长度已达100米,很快它将达到320米,并将成为世界上最大的斜拉桥。
Parameter analysis and comparison, given static wind affect the stability of long span cable-stayed bridge main parameters.
参数分析与比较,给出影响大跨径斜拉桥静风稳定性的主要参数。
Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.
作为叠合梁斜拉桥,四方台大桥的主梁由下部的工字钢和上部的混凝土行车道板组合而成。
At present, the law of the research on traveling wave effect for cable-stayed bridge with support system is rare in domestic.
目前,国内对于支承体系斜拉桥行波效应影响规律的研究成果并不多见。
It is very important for maintaining, monitoring and designing the great bridge to analyze and check the cable-stayed bridge.
斜拉桥检测分析研究对于这类大型桥梁的养管、维修、监测及结构设计有着十分重要的作用。
Taking Hebei street cable-stayed bridge as project background, this paper has a particular study to reasonable finished dead state.
本文以天津市河北大街斜拉桥为背景,对斜拉桥合理成桥状态的确定与施工控制展开研究。
Binzhou Yellow River bridge, which is a three-tower prestressed concrete cable-stayed bridge, applies the C55 concrete in the towers.
滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,桥塔采用C55高性能混凝土。
The mathematical model of slab stayed bridge for dynamic analysis is discussed with a railway slab stayed bridge project as an example.
以某铁路斜拉板桥方案为例,探讨斜拉板桥的动力分析模型。
In this thesis a new double decked, separating up and down vehicles, non-diaphragm and partially cable-stayed bridge structure is presented.
本文所研究的上下行分层矮斜拉连续箱梁桥属于无横隔板的双层新型结构。
The design characteristics of stay cables of partially cable stayed bridge referring to Xiaoxihu Yellow River Bridge in Lanzhou are presented.
以兰州市小西湖黄河大桥为例,说明部分斜拉桥斜拉索在设计上的一些主要特点。
It is big, though, with an 800-meter-long-main span that's the largest for a cable-stayed bridge in the nation, and the fifth largest globally.
这座长800米的大桥是该国最长,世界第五长的斜拉索桥。
Building a bridge in the Yangtze River meant breaking another record-at 120 meters, the Sutong has the deepest foundation of any cable-stayed bridge.
在扬子江上建造桥梁同时也意味着打破了另一项记录:苏通大桥拥有超过任何斜张桥的120米深桥基。
The paper deduces tangent stiffness matrix and set up geometrical nonlinear model of construction control calculation of the cable-stayed bridge.
推演了索单元的切线刚度矩阵,建立了斜拉桥施工控制计算的几何非线性模型。
The main bridge of Fumin bridge in Shenyang is a prestressed concrete cable-stayed bridge with double kinked column pylons and single cable plane.
沈阳市富民桥主桥为折线形双塔独柱式单索面预应力混凝土斜拉桥。
One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility .
斜拉桥与桁架和梁式类型桥之间,在结构上的一个最显著不同之处,在于柔度方面。
Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.
索塔·拉索锚固区是斜拉桥中的关键部位,其作用是将拉索的局部集中力安全,均匀地传递到塔柱。
Through the numerical analysis of the flow phenomenon around the cable-stayed bridge by means of numerical wind tunnel, the speed distribution of the f.
运用数值风洞法对斜拉桥部分周围流场进行数值模拟,得到斜拉桥周围流场的速度分布和斜拉桥表面的压强系数。
Through the numerical analysis of the flow phenomenon around the cable-stayed bridge by means of numerical wind tunnel, the speed distribution of the f.
运用数值风洞法对斜拉桥部分周围流场进行数值模拟,得到斜拉桥周围流场的速度分布和斜拉桥表面的压强系数。
应用推荐