If the project is too large then people would have to wait too long to gauge the status of adoption.
如果项目过大,那么大家又将不得不等待很长时间才能评估实施的情况。
This paper proposes a status table method to solve the problem that the production of CDMA2000 long code will cost too much time under software radio and low end plat environment.
提出一种状态表查询的方法,可以有效地解决软件无线电和低性能平台环境下CD MA2000长码生成过程和生成时间较长的难点。
This paper proposes a status table method to solve the problem that the production of CDMA2000 long code will cost too much time under software radio and low end plat environment.
提出一种状态表查询的方法,可以有效地解决软件无线电和低性能平台环境下CD MA2000长码生成过程和生成时间较长的难点。
应用推荐