Based on Shanghai metro M7 line project, the risk identification method is presented, taking dynamic risk identification process as the mainstream and static risk identification as a tool.
结合上海地铁7号线工程,提出以动态风险识别过程为主线,以静态风险识别为手段的风险识别方法,对地铁盾构法隧道工程建设的风险进行了识别。
Various risk control and safety management measure have been built according to different risk rank and risk category, which including management and control technology of dynamic and static risk.
根据风险级别和风险类别的不同,提出了不同的安全管理与风险控制措施,包括动态风险的管理控制技术和静态风险的管理控制技术。