• Open the "hot out" valve and let the tank start to fill. It will take probably about 5-10 minutes or so to get 45 gallons into the tank.

    我们打开热水出水阀,水自然地流入水箱,只要5至10分钟左右,水箱内就能添加45加仑水

    youdao

  • Press the "Start" button, the pump running, then open the suction valve of the pump.

    按下水泵按钮运转然后打开吸入

    youdao

  • Reciprocating pump discharge pipe must be before the start of the valve to open.

    往复启动必须排出管路中的阀门打开

    youdao

  • Should be fully open before the start of suction and discharge pipe valves, non-closing valve started.

    启动全开吸入排出管路中的阀门严禁启动

    youdao

  • Should be fully open before the start of the suction and discharge pipe valves, non-closing valve to start.

    启动全开吸入排出管路中的阀门严禁启动。

    youdao

  • Open piping attached to a filled tank will not start to drip-leak following installation and test of a Chemtrol Tru-Bloc shut-off valve.

    ChemtrolTru-Bloc关闭阀安装测试后,连接储的储罐管道开口不会开始滴漏

    youdao

  • Open piping attached to a filled tank will not start to drip-leak following installation and test of a Chemtrol Tru-Bloc shut-off valve.

    ChemtrolTru-Bloc关闭阀安装测试后,连接储的储罐管道开口不会开始滴漏

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定