This paper describes the reasonable structure design and fabrication method of tower crane standard section to ensure its quality and fulfil the working requirements.
本文介绍了塔身标准节的合理的结构设计与加工方法,以确保塔身标准节的制造质量和满足使用要求。
Two, rotary tooling, in order to prevent the torsional deformation of tower crane type standard section, between the two supporting plate should be added to the diagonal rod.
翻转式工装,为了防止塔机片式标准节的扭转变形,在两支板之间应加上斜杆。
Lift the 3 shaft adhered to wall to the suitable height, firstly, connect the shaft with one end of the standard section, then install on the connection plate of foundation bolt.
将三根附墙杆起吊到适当高度,首先用销轴将杆与标准节一端连接,然后安装到地脚螺栓连接板上。
To solve the problem of the variety of the main rod's size after welding to adjustable tower crane standard section, because of the difference of the material batch, a novel approach is proposed.
针对塔式起重机标准节主弦杆因材料批次不同焊接后尺寸不同的问题,提出对塔式起重机标准节主弦杆焊胎的改进方法。
To solve the problem of the variety of the main rod's size after welding to adjustable tower crane standard section, because of the difference of the material batch, a novel approach is proposed.
针对塔式起重机标准节主弦杆因材料批次不同焊接后尺寸不同的问题,提出对塔式起重机标准节主弦杆焊胎的改进方法。
应用推荐