This unit mainly supplies fuel gas for the equipment like in-plant boiler house heater in dehydration unit main combustion furnace in sour gas treatment unit tail gas incinerator and flare stack etc.
本单元主要为厂内锅炉房、脱水装置加热炉、酸气处理装置主燃烧炉、尾气灼烧炉以及放空火炬等燃气设备提供燃料气。
The problems in buiding blast furnace stack has been analysed. Th plan of multiple-head spiral masonry hasBeen raised.
分析了目前高炉炉身砌砖存在的问题,提出了多头螺旋,无错台砌筑方案。
High-voltage (HV) discharge phenomena, which appear in the working process of electron beam bombarding furnace (EBBF), may result in failure of HV silicon rectifier stack (SRS) in the worst cases.
电子束轰击炉运行过程会产生高压放电现象,严重时可能损坏高压整流硅堆。
Alkali metals are one of the important causes that leads to poor permeability of charge column, irregular furnace operation, frequent hanging and scaffolding in the stack.
碱金属是导致高炉料柱透气性恶化、炉况失常、频繁悬料和在炉身结瘤的一个重要原因。
Designing calculation of furnace stack and nozzle is studied.
同时介绍煤气炉炉体和煤气喷嘴的设计计算。
A stack nozzle is arranged above or behind the furnace body, and an air inlet chamber is arranged below the furnace body.
在炉体的上 方或后方设置出烟口,在炉体的下方设置进风室。
The inner part of a furnace is divided into three zones: the hearth, the bosh, and the stack.
高炉内部可分为三个区段:炉缸、炉腹、炉身。
The safety of production can be assured by installation of a balance safety valve at the top of the stack over the cupola furnace.
在冲天炉上部烟囱顶端设安全平衡盖板,以保证生产的正常进行;
The blast furnace 3, Meishan at the later phase of its campaign, with seriously eroded stack and mostly damaged cooling equipment, restrains the normal production of the blast furnace.
梅山三号高炉处于炉役后期,炉身侵蚀严重,冷却设备大量损坏,制约高炉正常生产。
The blast furnace 3, Meishan at the later phase of its campaign, with seriously eroded stack and mostly damaged cooling equipment, restrains the normal production of the blast furnace.
梅山三号高炉处于炉役后期,炉身侵蚀严重,冷却设备大量损坏,制约高炉正常生产。
应用推荐