• Blasting demolition of thin RC weir surface and mortared rubble is directly conducted on spillway dam.

    溢流坝面的薄层钢筋混凝土砌块石爆破拆除直接坝体进行

    youdao

  • Net cage stone is also used to spillway dam and diversion dam, flood may play a guiding effect of constraint.

    使用泄洪导流坝,起到引导或许约束洪水效果

    youdao

  • Stone cage net is applied to the spillway dam and diversion dam, flood may play a guiding effect of restraint.

    应用泄洪导流坝,起到引导或许束缚洪水效果

    youdao

  • Reinforced gabion mesh network is applied to the object of spillway dam and diversion dam, play a guiding role in flood or constraint.

    加筋格宾网格应用泄洪导流坝,起到引导或者约束洪水作用

    youdao

  • On this basis, the curve shapes and the formulas of upstream crest and downstream crest and those under the breast wall of the spillway dam are presented.

    以此为依据,提出有胸墙溢流坝的堰顶上、下游璃底缘曲线型式相应的计算公式。

    youdao

  • The application of carbon fiber textile is explained by an engineering example that the cracked concrete side pier of a spillway dam is strengthened with this material.

    水库溢流坝局部开裂补强加固为介绍采用条状的碳纤维布增强闸边墩混凝土的新技术。

    youdao

  • Works in such conditions, local materials spillway dam how to coordinate the size and height of buildings to ensure that safety is a major engineering design experience.

    此类工程条件下当地材料如何协调泄洪建筑物规模坝高保证工程安全工程设计的主要经验。

    youdao

  • According to the design of spillway dam on arch dam in Wanjiagou reservoir, this paper elaborates special problems and solving method of spillway dam in design and construction.

    本文万家沟水库拱坝溢流坝设计为例,阐述了这种坝型设计施工一些特殊问题解决方法

    youdao

  • An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.

    三峡工程泄洪坝段混凝土通仓浇筑建立了模拟混凝土施工过程整体模型

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

  • The dam builders underestimate the risk of spillway failure.

    水坝工程师低估了泄洪道失控风险

    youdao

  • The town built a new dam and spillway before collecting water in the lake again.

    再次湖里灌水以前小镇修睦了新的大坝泄洪道

    youdao

  • As "bottlenecks" in the earth dam, the selection of the spillway is crucial.

    作为石坝卡脖子”工程,溢洪道方案选择至关重要。

    youdao

  • In order to monitor project's safety status of every section it is designed to arrange some interrelated instruments at slope dam spillway and diversion tunnel.

    为了监测工程部位安全状态设计分别边坡洪道工程部位布置了相关观测仪器。

    youdao

  • Technical solutions include dam reinforcement, spillway capacity increase and temporary storage of water in large reservoirs.

    技术方案包括大坝加固溢洪道泄洪能力提升临时储水设施。

    youdao

  • On the basis of the Conclusion of safety certification, being directed against the project questions, the dam widen, spillway rebuild, irrigation conservancy and channel rebuild have been adopted.

    水库安全鉴定主要结论为基础针对工程中实际存在问题,采取了相应的大坝加宽溢洪道改建灌溉输水涵管补漏东西灌渠的改建等除险加固设计。

    youdao

  • Major earth and rockfill dams must have "an emergency exit" (emergency spillway or emergency measures) in case super floods cause dam failures.

    重要石坝必须设“太平门”(非常溢洪道),以便遭遇非常洪水时采取非常溢洪措施

    youdao

  • A certain reservoir dam spillway slope stability and affect the normal operation of the reservoir storage key projects.

    水库工程溢洪道边坡影响大坝稳定蓄水后水库正常运行关键工程

    youdao

  • This paper introduced the design, measurement accuracy and operation of the automatic external deformation monitoring system for dam slab and spillway of Lianhua hydropower station.

    介绍莲花水电站大坝面板溢洪道外部变形自动化监测系统设计测量精度分析运行情况。

    youdao

  • The paper focuses on the key and difficult technical problem of crest overflow of concrete face rockfill dam, analyses and researches spillway on dynamical and static stability.

    本文针对溢流混凝土面板堆石坝坝顶溢流关键技术难题分析研究了溢洪道静力动力稳定性。

    youdao

  • The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.

    位于泄洪坝段左厂房坝段之间导墙坝段下游

    youdao

  • This paper discussed the characters of rubber dam on the reservoir spillway. From analysis and discussion of the management experience and application, some practical measures were put forward.

    阐述水库溢洪道橡胶特点通过对水库溢洪道橡胶坝应用管理经验分析,提出了橡胶坝的应用管理措施。

    youdao

  • The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.

    小山水电站工程钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。

    youdao

  • The discharge capacity of shaft spillway with framed inlet tower used for high tailings dam is studied by physical model.

    介绍了用于尾矿具有圆形框架式进水塔的竖井排洪道泄流能力模型试验研究

    youdao

  • Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.

    阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝坝顶表孔泄洪流消能。

    youdao

  • Crews in California worked to repair damage done to the spillway of the Oroville dam.

    加州工作人员正努力维修奥罗维尔大坝泄洪道

    youdao

  • Though optimization of broad of spillway and dam height of silt dam, their optimum combination was found;

    通过溢洪道宽度淤地坝坝优选,找到二者的最佳组合

    youdao

  • The research about the section design, the treatment of spillway section and the anti-seepage system of overflow concrete face rockfill dam that is constructed on the rock foundation is performed.

    本文主要探讨岩基上溢流面板堆石坝断面设计溢流处理防渗系统

    youdao

  • Some reservoir dam spillway slope is composed of argillaceous rocks and other soft rocks, the developing weak Interlayer, leads to complicated engineering geological conditions.

    水库溢洪道边坡岩为主组成的横斜坡,地质发育工程地质条件复杂

    youdao

  • Some reservoir dam spillway slope is composed of argillaceous rocks and other soft rocks, the developing weak Interlayer, leads to complicated engineering geological conditions.

    水库溢洪道边坡岩为主组成的横斜坡,地质发育工程地质条件复杂

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定