• Uncertain factors in construction of continuous girder bridge such as side span joint scheme and different balanced cantilever construction speed are analyzed.

    施工中的不确定因素诸如合拢方案不同桥墩浇进度不一致等进行了分析比较。

    youdao

  • From the point of internal force and deformation, the influence of girder joint scheme of side span on construction control is discussed.

    受力变形角度讨论了合龙方案连续梁桥施工控制影响

    youdao

  • Along with the wider use of monolithic joint in the design of long span steel truss Bridges, the fatigue of weld details under traffic loads gradually attracted more attention of the architects.

    随着整体节点正逐渐跨度桁架设计采用,在交通荷载作用下焊接局部疲劳问题日益引起人们重视

    youdao

  • Depending on the height and span of the grid, the rows of columns can be doubled, which results in a very clean joint.

    根据高度网格跨度设置双排梁,带来十分清晰明了的结点。

    youdao

  • The initial deviations of the joint positions are the main initial geometrical imperfections that affect the stability behaviors of the long-span spatial structures.

    节点位置偏差影响跨度空间结构整体稳定性一个主要初始几何缺陷,但目前关于实际结构中节点位置缺陷资料还很少。

    youdao

  • Maximum length of field pipeline span is related to the factors such as the strength of pipes and joint adapters, and the allowable pack Angle, etc.

    机动管线最大悬空长度管子连接器强度以及允许最大折转角等因素关系

    youdao

  • The universal joint assembly improves the integral property of the universal joint, and prolongs the service span.

    提高了万向整体性能延长了其使用寿命。

    youdao

  • The universal joint assembly improves the integral property of the universal joint, and prolongs the service span.

    提高了万向整体性能延长了其使用寿命。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定