The geometrical alignment control for the construction of multi-span continuous girder Bridges with MSS (Movable Support System) has its own characteristics.
采用移动模架施工多跨连续梁时,线形控制有其自身的特点。
Using a spatial composite finite element method, combining three-dimensional solid element and bar element, the mechanical analysis of a two-span curved PC continuous box girder bridge is conducted.
采用三维实体单元和杆单元相结合的空间组合有限元方法,对一座两跨曲线预应力混凝土箱形连续梁桥进行空间受力分析。
Cracking is quite common in prestressed concrete continuous box girder bridge, which influences appearance of component, life span of using, and even safety of structure,.
预应力混凝土连续箱梁桥的开裂可以说是“多发病”,影响着构件的外观、使用寿命,甚至结构安全。
A two-span continuous curved box girder model was made with Perspex.
建立一两跨连续曲线箱梁有机玻璃试验模型。
Underwater placement of bridge's platform and cradle construction method for multi-span continuous box-girder structure constitute the construction feature of Fuyang bridge in Zhejiang province.
以水下浇筑大桥承台和采用挂篮法施工多跨连续箱梁结构是浙江富阳大桥工程的重头戏。
Aiming at the main damage and its causes of a large-span continuous rigid framework bridge, the strengthening measure of adding the external cable to prestressed concrete box girder was introduced.
针对某大跨度连续刚构桥出现的主要病害及其原因,介绍了采取增设预应力混凝土箱梁体外索的加固措施。
Uncertain factors in construction of continuous girder bridge such as side span joint scheme and different balanced cantilever construction speed are analyzed.
对施工中的不确定因素,诸如边跨合拢方案和不同桥墩悬浇进度不一致等进行了分析比较。
In addition, the plastic ultimate strength of cross section and some proposals concerning the ultimate strength design of long span PPC continuous box girder...
此外,还对截面塑性极限强度问题进行了探讨,提出了大跨ppc变截面连续梁极限强度设计的建议。
In addition, the plastic ultimate strength of cross section and some proposals concerning the ultimate strength design of long span PPC continuous box girder wi...
此外,还对截面塑性极限强度问题进行了探讨,提出了大跨ppc变截面连续梁极限强度设计的建议。
There is an analysis of spatial stress on variable cross-section wide box girder of three-span continuous PC rigid frame bridge in the paper.
对一座铁路三跨连续PC刚构桥变截面宽幅箱梁进行了空间应力分析。
In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.
介绍大跨度不对称曲线预应力混凝土连续梁桥的设计和成桥后的静、动载试验。
The Dagu River Shipping Channel bridge of Qingdao Bay bridge is a single tower self-anchored suspension bridge with asymmetric 4-span continuous steel box girder.
青岛海湾大桥大沽河航道桥为不对称独塔四跨连续钢箱梁自锚式悬索桥。
The Dagu River Shipping Channel bridge of Qingdao Bay bridge is a single tower self-anchored suspension bridge with asymmetric 4-span continuous steel box girder.
青岛海湾大桥大沽河航道桥为不对称独塔四跨连续钢箱梁自锚式悬索桥。
应用推荐