In the time of pressing the pile, the grout are inject into the soil. When the pile tip reaches the design depth, then continue to inject grout into the pile, so that the pile head expand.
在压桩过程中同时在桩侧注入浆液,桩尖达到设计深度后,浆液随着桩的沉入在桩端形成注浆扩大头。
In the time of pressing the pile, the grout are inject into the soil. When the pile tip reaches the design depth, then continue to inject grout into the pile, so that the pile head expand.
在压桩过程中同时在桩侧注入浆液,桩尖达到设计深度后,浆液随着桩的沉入在桩端形成注浆扩大头。
应用推荐