The customer can't specify requirements up front and then disappear, counting on plausible deniability to cover for himself if the software ends up a bomb.
客户不能预先说明需求后就离开,若软件失败则依靠难以自圆其说的推诿伎俩来为自己掩护。
This paper introduced the design method of the period measure system of electronic bomb controller, offering the detailed hardware constituents and the software design method.
介绍了电动投弹器周期测量系统的设计方法,并给出了较为详细的硬件组成及软件设计方法。
This paper introduced the design method of the period measure system of electronic bomb controller, offering the detailed hardware constituents and the software design method.
介绍了电动投弹器周期测量系统的设计方法,并给出了较为详细的硬件组成及软件设计方法。
应用推荐