• At the site, one lone survivor sat with his back against a tree, chewing on a bone. As he tossed the bone onto a huge pile of bones, he noticed the rescue team.

    飞机坠毁的地方,仅剩的那位幸存者倚靠在树旁,把刚刚光的骨头旁边骨头堆里,这时,看到救援队到来了。

    youdao

  • Not only is the pile-on digging activity possible on the site, it is actually enhanced and made easier by the very design of it!

    网站设计这种跟风投票方式不仅变得可能事实上变得越来越容易

    youdao

  • Then, design institute edits technology specification of main auxiliary equipment, drawing for site test pile and requirements for test pile.

    之后设计院编写主要辅机设备技术规范书现场试桩所需的试验图纸及试桩要求

    youdao

  • They had also found 13 bodies, but many more remain beneath the 30-foot pile of concrete, brick, and plaster, as the slight odor of putrefaction hanging over the site testifies.

    此外他们找到十三遗体更多遗体可能还被掩埋混凝土砖块水泥废墟下面三十英尺的地方,因为这里已经可以闻到轻微腐烂气味

    youdao

  • At a jacked pile foundation construction site in Chuangchun, declinometer technique is applied for field monitoring.

    结合长春明珠会所静压基础施工工程,测技术应用于现场进行试验。

    youdao

  • The site is prone to flooding so the entire building is constructed on an engineered concrete slab, which raises the house above historic flood levels by using screw-pile footings.

    基地易于洪水因此整个建筑用工程性混凝土建造通过使用螺旋桩基础,让房子升高在历史洪水水位之上

    youdao

  • It briefly introduces the theory of low strain dynamic testing of pile. Then according to examples, it expresses a view for the operation in site and analysis indoor.

    简要介绍变法检测桩基完整性原理通过工程实例剖析现场操作室内分析过程中的要点谈几点体会和见解

    youdao

  • However, the requirements of observation accuracy are high, especially the treatment of pile cap should be careful and earnest on the test site.

    现场试验时观测精度要求较高尤其是桩头处理要求细致认真

    youdao

  • Pile foundation is widely used in construction in Shanghai region, but the site test data on bearing capacity of pre-cast concrete pile based on cohesive soil were lower than theoretical level.

    上海地区建筑工程普遍采用桩基粘性为持力层预制实测承载力普遍低于理论值,主要是因为休止期较短及对端承力作用认识不足。

    youdao

  • This paper predicate the ultimate bearing capacity of squeezed branch pile based on 110 pile from different site by hyperbola method, and compare with the results of the friction pile's.

    用双曲线方法110根扩支盘极限承载力进行预测与直杆桩预测结果进行对比

    youdao

  • Based on the site loading experiment on SPIMP composite foundation, the interaction between pile and soil are studied in detail and the internal force analysis method is put forward.

    本文通过静压复合地基载荷试验分析研究了预制静压桩复合地基相互作用变化规律刚性桩复合地基承载力设计计算方法。

    youdao

  • Using the transient Rayleigh wave method can measure the shear velocity of site soil and estimate the bearing capacity of pile.

    应用瞬态雷波技术快速检测剪切波速从而实现单桩承载力检测。

    youdao

  • Site test result and calculation formula establishment of pile-anchored foundation are introduced in this paper.

    通过现场实验得出有关桩基础特点建立计算公式

    youdao

  • At present, the pile sinking is under progress on site to prepare the condition for the contractor of civil works to enter site.

    现场施工正在进行以后土建单位进驻现场准备条件

    youdao

  • The paper introduced the use of airlifting reverse circulation rotary drilling techniques in practice of major diameter socket pile operation at Xiangfan city's Hanjiang No. 4 bridge site.

    介绍使用泥浆护壁气举循环回转钻进工艺进行襄樊汉江四桥口径嵌岩的施工实践

    youdao

  • The paper analyzed the load transfer behavior and bearing capacity characterstics of pile based on the in-site test data of five instrumented piles.

    本文通过身内埋设量测元件试桩资料分析荷载传递机理承载性状,以及施工工艺对其影响和作用。

    youdao

  • The excess pore pressure measured in the same site is also compared with them. The maximum influence radius of the increment of soil pressure under the pile tip is discuss...

    同一场地测得压力增量孔隙水压力进行比较,并对端下土压力增量的最大影响半径进行了讨论。

    youdao

  • The dynamic interaction of pile-soil-structure in liquefiable site, especially, the seismic response on pile, are studied with the method of whole dynamic finite elements under seismic condition.

    采用挤扩支盘-土-结构体系进行振动台模型试验,了解震动激励体系抗震性能以及支盘桩对结构体系的抗拉、抗压及抗扭曲的作用

    youdao

  • Study on the technology of the cement mixing pile composite foundation and the site construction management;

    结合扬子石化清净排口基坑工程,介绍水泥搅拌土锚组合支护结构的实际应用。

    youdao

  • Study on the technology of the cement mixing pile composite foundation and the site construction management;

    结合扬子石化清净排口基坑工程,介绍水泥搅拌土锚组合支护结构的实际应用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定