At the site, one lone survivor sat with his back against a tree, chewing on a bone. As he tossed the bone onto a huge pile of bones, he noticed the rescue team.
在飞机坠毁的地方,仅剩的那位幸存者倚靠在树旁,把刚刚啃光的骨头扔到旁边的骨头堆里,这时,他看到救援队到来了。
Not only is the pile-on digging activity possible on the site, it is actually enhanced and made easier by the very design of it!
网站的设计让这种跟风的投票方式不仅是变得可能,事实上变得越来越容易。
Then, design institute edits technology specification of main auxiliary equipment, drawing for site test pile and requirements for test pile.
之后设计院编写主要辅机设备的技术规范书及现场试桩所需的试验桩图纸及试桩要求。
They had also found 13 bodies, but many more remain beneath the 30-foot pile of concrete, brick, and plaster, as the slight odor of putrefaction hanging over the site testifies.
此外他们还找到十三具遗体,但更多的遗体可能还被掩埋在混凝土,砖块和水泥废墟下面三十英尺的地方,因为这里已经可以闻到轻微的腐烂气味。
At a jacked pile foundation construction site in Chuangchun, declinometer technique is applied for field monitoring.
结合长春明珠会所静压桩基础施工工程,测斜仪技术应用于现场进行试验。
The site is prone to flooding so the entire building is constructed on an engineered concrete slab, which raises the house above historic flood levels by using screw-pile footings.
该基地易于发洪水,因此整个建筑用工程性的混凝土板建造,通过使用螺旋桩基础,让房子升高在历史的洪水水位之上。
It briefly introduces the theory of low strain dynamic testing of pile. Then according to examples, it expresses a view for the operation in site and analysis indoor.
简要介绍低应变法检测桩基完整性的原理,通过工程实例剖析,对现场操作和室内分析过程中的要点谈几点体会和见解。
However, the requirements of observation accuracy are high, especially the treatment of pile cap should be careful and earnest on the test site.
但现场试验时,观测精度要求较高,尤其是桩头处理要求细致认真。
Pile foundation is widely used in construction in Shanghai region, but the site test data on bearing capacity of pre-cast concrete pile based on cohesive soil were lower than theoretical level.
上海地区建筑工程普遍采用桩基,但以粘性土为持力层的预制桩实测承载力普遍低于理论值,主要是因为休止期较短及对端承力作用认识不足。
This paper predicate the ultimate bearing capacity of squeezed branch pile based on 110 pile from different site by hyperbola method, and compare with the results of the friction pile's.
用双曲线方法对110根挤扩支盘桩的极限承载力进行预测,并与直杆桩预测结果进行对比。
Based on the site loading experiment on SPIMP composite foundation, the interaction between pile and soil are studied in detail and the internal force analysis method is put forward.
本文通过静压小桩复合地基载荷试验及分析,研究了预制静压桩复合地基桩土相互作用变化规律及刚性桩复合地基承载力设计计算方法。
Using the transient Rayleigh wave method can measure the shear velocity of site soil and estimate the bearing capacity of pile.
应用瞬态瑞雷波技术可快速检测桩周土的剪切波速,从而实现单桩承载力的检测。
Site test result and calculation formula establishment of pile-anchored foundation are introduced in this paper.
通过现场实验得出有关锚桩基础的特点并建立计算公式。
At present, the pile sinking is under progress on site to prepare the condition for the contractor of civil works to enter site.
现场沉桩施工正在进行,为以后土建单位进驻现场准备了条件。
The paper introduced the use of airlifting reverse circulation rotary drilling techniques in practice of major diameter socket pile operation at Xiangfan city's Hanjiang No. 4 bridge site.
介绍了使用泥浆护壁气举反循环回转钻进工艺进行襄樊汉江四桥大口径嵌岩桩的施工实践。
The paper analyzed the load transfer behavior and bearing capacity characterstics of pile based on the in-site test data of five instrumented piles.
本文通过五根桩身内埋设量测元件的试桩资料,分析桩的荷载传递机理与承载性状,以及施工工艺对其影响和作用。
The excess pore pressure measured in the same site is also compared with them. The maximum influence radius of the increment of soil pressure under the pile tip is discuss...
也将同一场地测得的侧压力增量与超孔隙水压力进行比较,并对桩端下土压力增量的最大影响半径进行了讨论。
The dynamic interaction of pile-soil-structure in liquefiable site, especially, the seismic response on pile, are studied with the method of whole dynamic finite elements under seismic condition.
采用挤扩支盘桩-土-结构体系进行振动台模型试验,以了解在地震动激励下该体系的抗震性能以及支盘桩对结构体系的抗拉、抗压及抗扭曲的作用。
Study on the technology of the cement mixing pile composite foundation and the site construction management;
结合扬子石化清净排口基坑工程,介绍了水泥搅拌桩与土锚组合支护结构的实际应用。
Study on the technology of the cement mixing pile composite foundation and the site construction management;
结合扬子石化清净排口基坑工程,介绍了水泥搅拌桩与土锚组合支护结构的实际应用。