• The justifying conditions can be used to justify the location of faults, including single phase earthing, two phases earthing and two phases shorting.

    判据可以不对称故障进行故障定位,这些故障包括单相接地故障、相接地故障短路故障。

    youdao

  • Aim at an-arc suppression reactor earthing power system, we design a suit of microcomputer system for compensating single-phase earthing current and selecting line.

    针对中性点经消弧线圈接地电流接地系统设计了一单相接地补偿及选线的微机保护装置。

    youdao

  • Aim at an-arc suppression reactor earthing power system, a suit of microcomputer system for compensating single-phase earthing current and selecting line was designed.

    针对中性点经消弧线圈接地电流接地系统,设计了一单相接地补偿及选线的微机保护装置。

    youdao

  • This Paper analyses the harm of single-phase earthing in electricity supply system of mine and introduces several type of common ways of leakage protection.

    分析井下供电系统单相接地危害介绍几种常见漏电保护方法

    youdao

  • The paper analyses the theory of some line-selecting earthing devices, they are unable to solve the problem of single-phase earthing line-selecting in petty current earthing system satisfactorily.

    本文对几种常用接地选线装置原理进行了分析存在不能园满解决电流接地系统单相接地的选线问题

    youdao

  • Zero-sequence transient energy is calculated for low earthing resistance and single-phase transient energy for high earthing resistance.

    并且根据接地电阻的大小选择不同的能量算式,故可判断金属性接地故障和接地电阻接地故障。

    youdao

  • The first class cablesuitable for one singlephase earthing – block time does not exceed one minute each time. Max. time not exceed 8 hours , and not exceed 125 hours in all in one year.

    一类——用于单相接地故障时间一般大于1min,亦可用于最长不超过8小时每年累计不超过125小时的系统。

    youdao

  • The first class cablesuitable for one singlephase earthing – block time does not exceed one minute each time. Max. time not exceed 8 hours , and not exceed 125 hours in all in one year.

    一类——用于单相接地故障时间一般大于1min,亦可用于最长不超过8小时每年累计不超过125小时的系统。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定