Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
The flood simulation in flood detention basin is the basis of non engineering measure such as risk analysis and resident hazard prevention.
蓄滞洪区洪水模拟是风险分析与居民防洪避险等非工程措施的重要依据。
In the analysis, the "quantitative risk assessment" technology and "stochastic simulation technique for non-Guassian multivariate random variables with different correlations" technology are used.
分析过程中,运用了定量风险评估技术和多维随机变量联合概率随机模拟技术。
In this paper, a financial risk analysis method based on probability theory and the Monte Carlo simulation technique is put forward and applied to the analysis of a hydropower project.
本文提出了基于概率论与模拟技术的工程项目财务风险分析方法,并在某大型水电站工程中进行了应用研究。
The series are calculated and analyzed by correlation analysis, stochastic simulation, Monte Carlo, and Markov chain, Monte Carlo, so a group model of risk function is established.
采取相关分析、随机模拟、蒙特卡罗和马尔柯夫链等方法进行了一系列的分析和计算,从而建立了一组风险函数。
The general principle and method of computer simulation for the risk analysis of the constructive project of industry are presented. The accuracy of the Simulation result is analyzed as well.
提出了工业建设项目风险分析计算机仿真的一般原理与方法,并对仿真结果进行了精度分析。
Risk variables of investment risk analysis of shipbuilding project are characterized by multiplicity and complex dynamicity. Monte Carlo simulation can be a good solution to this problem.
造船项目风险分析的风险变量具有多重性与复杂动态性特征,蒙特卡洛模拟方法可以较好地解决此问题。
Examples of tools for risk assessment include fault modes and effects analysis, fault tree analysis, relationship diagrams, simulation techniques, and reliability prediction.
风险评估的方法可包括:故障模式和影响分析; 故障树分析;关联图;模拟技术;可靠性预计。
Article discussed in detail the analysis of project risks and a number of ways, and use examples of Monte Carlo simulation method of proof at the Tender Offer risk analysis.
文章详细探讨了工程风险分析的多种方法,并利用实例论证蒙特卡洛模拟方法在投标报价风险分析中的应用。
In this paper, the risk analysis for dike safety and emergency measures for dike burst is studied based on flood routing numerical simulation in the lower reaches of Liaohe River.
本文以辽河下游堤防及其保护区为研究实例,以洪水数值模拟为基础,对堤防防洪的失事风险率评价以及溃口应急对策展开了研究。
In the end, the separate geological risk assessments of six structures are evaluated by the analysis and simulation for basins and reservoir inversion.
充分运用盆地模拟手段和道积分反演技术,针对六个重点构造进行地质风险评价。
This paper will analysis the risk factors and profit allocation by establishing mathematic model and illustrates by a simulation example.
本文将分析系统中各主体的承担的风险大小,建立相关的数学模型,就系统的收益风险进行实证研究。
This paper will analysis the risk factors and profit allocation by establishing mathematic model and illustrates by a simulation example.
本文将分析系统中各主体的承担的风险大小,建立相关的数学模型,就系统的收益风险进行实证研究。