An adhesive dike slot (31) is formed around the joint concave bottom, thus preventing the main body and the neck back side from dirtiness caused by excessive adhesive overflow.
粘合剂堤槽(31)形成在接合凹底部的周边,以防止用粘合剂连接时过量粘合剂溢出弄脏主体及琴颈的背面。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
应用推荐