• They are aimed at either cleaning the water in the primary system, providing separate shutdown cooling functions, water chemistry, charging and volume control, makeup water.

    它们目标清理系统提供分离的停止,冷却功能,水化学装料及容量控制补充水。

    youdao

  • But even after shutdown, there is residual heat that needs to be drawn off by cooling water pumped through the reactor core, and that’s where the trouble came.

    但是即便终止之后,依旧余热存在,需要冷却水泵抽水注入反应堆将热量散去,也是问题所在。

    youdao

  • The typical Component Cooling System is used during all phase of plant operation, including shutdown and post-accident.

    设备冷却水系统用于电厂所有运行阶段包括停堆事故后处理

    youdao

  • The fast cooling technology of steam turbine is the process that the cooling medium is used to accelerate the temperature reduction of cylinder and rotor after the shutdown of turbogenerator.

    汽轮机快速冷却技术汽轮机组停运汽轮机内部通以适量较低温度冷却介质进行强迫对流换热,加快汽缸转子速度的过程

    youdao

  • By applying cooling down method of adding factory air into the HP system, shortens urea converter cooling down time to a large scale and decreases shutdown losses for enterprise.

    通过采用向尿素合成加入工厂空气降温方法,与传统方法相比大幅度缩短降温时间企业减少停工损失

    youdao

  • The forced air cooling device for 600MW unit after shutdown is introduced.

    介绍了600MW机组停机空气强制冷却装置对其使用中的操作步骤;

    youdao

  • The forced air cooling device for 600mw unit after shutdown is introduced. The operation procedures, noteworthy points, effect after the device putting into service are described in detail.

    介绍了600MW机组停机空气强制冷却装置,并对使用中的操作步骤注意事项投入使用后的效果进行详细的阐述。

    youdao

  • Large area freezing, damage etc. failures occen occur on the air cooling condensers during start-up and shutdown of large size direct air cooling coal-fired generating units in winter.

    大型直接燃煤发电机组冬季启停过程中,空冷凝汽器常常会发生大面积冻结损坏事故。

    youdao

  • The separable cooling plug and shutdown procedure includes accommodating any excess plastic in a created void between the cooling plug and the extruder.

    分离的冷却停机程序包括任何多余塑料容纳冷却塞和挤压器之间生成空隙中。

    youdao

  • Antifreezing is always a notable problem in the start-up in winter, shutdown process and low load operation period of air cooling condenser of large size direct air cooling unit.

    大型直接机组空冷凝汽器冬季启动停机过程以及负荷运行阶段防冻问题尤为突出。

    youdao

  • In this paper, the operation process of variable-parameter shutdown and forced cooling of300 MW units in Mawan Power Station is described at length.

    详细介绍深圳妈湾发电厂机组滑参数停机制冷方法过程

    youdao

  • The analysis of long term cooling for a pool type reactor after shutdown is presented.

    座池反应堆剩余发热长期冷却进行了分析

    youdao

  • The analysis of long term cooling for a pool type reactor after shutdown is presented.

    座池反应堆剩余发热长期冷却进行了分析

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定