• As the construction period is rather short, the pore water pressures of the dumping cohesive soil can only partially dissipate and then the shear strength is quite low.

    由于施工期,水下填粘土孔隙压力只能部分地消散因而剪强度较低。

    youdao

  • As the construction period is rather short, the pore water pressures of the dumping cohesive soil can only partially dissipate and then the shear strength is quite low.

    由于施工期,水下填粘土孔隙压力只能部分地消散因而剪强度较低。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定