In order to minimize settling times when measuring high resistance values, keep shunt capacitance in the system to an absolute minimum by keeping connecting cables as short as possible.
在测量高阻值电阻时,为了尽量减小建立时间,使连接电缆尽可能地短,以便使系统中的并联电容实际上达到可能的最小值。
Conclusions Minimally invasive ventricle peritoneal shunt could obviously reduce the post operation complications and short the operation time.
结论微创脑室-腹腔分流术能明显减少手术后的并发症,并能缩短手术时间。
This paper expatiates on the concept of earth short-circuit current, discussing and computing the shunt coefficient of overhead ground wires, cable lines and hybrid overhead cable lines.
为此,阐述了入地电流的概念,对输电线路架空避雷线、电缆线路及架空电缆混合供电线路的分流系数进行了探讨和计算。
For short - circuit faults occurring in power systems, the behavior of shunt active power filter APF is analyzed. It is concluded that the overcurrent phenomena will happen during the fault period.
对并联型电力有源滤波器(APF)在电力系统发生各种短路故障时的行为进行了分析,得出了在系统发生故障期间APF会发生过流现象的结论。
For short - circuit faults occurring in power systems, the behavior of shunt active power filter APF is analyzed. It is concluded that the overcurrent phenomena will happen during the fault period.
对并联型电力有源滤波器(APF)在电力系统发生各种短路故障时的行为进行了分析,得出了在系统发生故障期间APF会发生过流现象的结论。
应用推荐