• Finally, a processing method of shear wall core while adopting the high-lever story isolation technology is proposed which can provide a reference for similar engineering structures.

    最后提出采用高位层间隔技术电梯井处理方法可供相关工程设计参考。

    youdao

  • The final failure mode of the model is tension failure of perimeter columns and bottom of core wall on the tension side caused by overturning moment, and the story shear failure mode was not found.

    结构发生剪切破坏最终破坏模式倾覆力矩作用下底部核心筒受受拉外框拉断

    youdao

  • By use of the uniformization technique, a continuous computational model is developed for the analysis of frame-shear wall-thin walled core skew combined structures.

    采用沿高度方向连续方法建立框架-剪力墙-薄壁筒斜交结构协同分析连续化计算模型

    youdao

  • Finally, the shear strength reduction technique is used to analyze the seismic stability of Nuo Zhadu core wall type rockfill Dam and Chang Heba core wall type rockfill Dam in FEM.

    最后采用有限元强度折减技术分析糯扎渡堆石坝长河坝心墙堆石坝上下游抗震稳定性

    youdao

  • Finally, the shear strength reduction technique is used to analyze the seismic stability of Nuo Zhadu core wall type rockfill Dam and Chang Heba core wall type rockfill Dam in FEM.

    最后采用有限元强度折减技术分析糯扎渡堆石坝长河坝心墙堆石坝上下游抗震稳定性

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定