• Earth dam consists of shallow sand and is located between the plant and the overflow dam. It is 2800 meters long and 600 meters wide.

    土坝由浅沙筑成,长2800米,宽600米,位于电厂与溢流堰之间。

    youdao

  • The method of shallow layer seismic image is used to test a reinforced concrete dam and the test results are comprehensively analyzed.

    并对某钢筋混凝土大坝采用浅层地震映像法检测的实例结果进行了综合分析。

    youdao

  • The observation result of vibration is rational either in middle shallow blasting or in rock excavation near the dam.

    不论是中部浅孔爆破,还是大坝近区岩体开挖,其振动观测结果总体合理。

    youdao

  • The observation result of vibration is rational either in middle shallow blasting or in rock excavation near the dam.

    不论是中部浅孔爆破,还是大坝近区岩体开挖,其振动观测结果总体合理。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定