• This paper recommends a method of lowering the ground water table by setting up the horizontal drains in hill slopes.

    介绍土坡设置水平渗水管来降低地下水位一种方法

    youdao

  • For example, when the setting sun moves to the spot inside the stone arch of the altar, its rays spread across the ground and each rough spot on the ground is resplendent in the sunshine;

    譬如祭坛石门中的落日,寂静光辉平铺的一刻,地上一个坎坷都映照得灿烂;

    youdao

  • Combined with survey experience, the author probed into the methods of setting up ground control net with GPS and EDM lead for small hydropower projects based on the introduction of practice examples.

    结合测量经验探讨GPSEDM导线建立水电工程地面控制方法,并实例加以介绍

    youdao

  • This has turned out to be a good setting for landscape shots which capture good proportions of ground and sky.

    证明一个好的设置风景拍摄捕获地面天空良好比例

    youdao

  • Therefor, the soil resistivity of the substation is investigated; the features and the techno economical indexes of conducting concrete are analyzed, thus setting the scheme of the ground net.

    为此,对变电站所在地土壤进行了电阻率调查分析了导电混凝土特性及其技术经济指标最终确定地网方案

    youdao

  • This offers a theoretical ground for setting the region of projection and constructing accurately the lines of intersection.

    确定截交线投影范围准确地绘制截交线,提供理论依据

    youdao

  • It is a ground lifted to absorb parking below, and then shaped to define the setting for changing patterns of collective life above.

    升空吸收停车低于地面,然后形状确定上述变化集体生活模式设置

    youdao

  • A new method and steps of setting up a finite fault source model of a scenario earthquake on an active fault for predicting near-fault strong ground motion are proposed here.

    提出了断层震动预测建立断层设定地震有限断层震源模型方法步骤

    youdao

  • Then in June, as if by magic, a never-setting summer sun gives birth to hundreds of species of arctic plants to cover the ground.

    然后3-6月份,好像是施了魔法一样,一轮永不落夏天太阳生出数百北极植物覆盖着大地。

    youdao

  • Setting the back ground music in reading room is helpful to keep calm, relieve of anxiety and enhance the study interest for the readers.

    阅览室设置背景音乐有助于读者平静心态解除烦恼提高学习兴趣

    youdao

  • The wet-setting loess meeting with water will cause the obvious unequal settlement and endanger upside structure. There are many measures of ground treatments for wet-setting loess.

    湿性黄土产生较大不均匀沉降,从而会危害上部结构安全。

    youdao

  • A cementing method of separable setting and variable density is used, with two level controls of safety valve on the ground and downhole;

    采用凝固密度固井方式,均采用地面地下安全阀控制

    youdao

  • Ground-fault protection characteristic curve, the adjustment step of the setting current Ir4 is 1A.

    接地故障保护特性曲线,整电流Ir4调整长为1A。

    youdao

  • Ground-fault protection characteristic curve, the adjustment step of the setting current Ir4 is 1A.

    接地故障保护特性曲线,整电流Ir4调整长为1A。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定