Production sequencing problem is focus of study in abroad.
就业在未来十年将始终是热点问题。
The aircraft sequencing problem of route intersection in air traffic flow management was discussed.
讨论了空中交通流量管理中在航路交汇点上的飞机排序问题。
If you are defending your business to your banker "after" filing the S-1, you had a clear sequencing problem.
如果提交了S - 1申请“之后”,你还得在投行面前为公司辩护,则显然颠倒了先后顺序。
In this paper, we propose a new machine process sequencing problem with two objectives considering the operation flexibility.
在允许作业柔性加工的基础上,本文提出一种新的两目标机器加工排序问题。
Application of fuzzy mathematics method, this essay presents an algorithm to solve single machine sequencing problem with multiobjectives.
本文运用模糊数学的方法,提出一种单台机器多目标作业排序的算法。
Machines process sequencing problem with due date Windows in NP hard in the strong sense, traditional algorithms usually are not satisfied.
具有窗口式交货期的加工排序问题是一个强np困难问题,传统方法的计算效果往往不能令人满意。
The numerical experiments show the effectiveness of the proposed method in dealing with the flexible process sequencing problem with two objectives.
数值计算表明,该方法对两目标的柔性加工排序问题是有效的。
The optimal design for a kind of sequencing problem of N-set is investigated, and the least substitution times of the converse ordinal of N-set is obtained.
研究N元集的一类排序问题的最优设计,得到了N元集逆序排序所需的最少抽换次数,同时也给出了相关的结果和算法的实。
The mathematical mode of a sequencing problem in management system is raised and it is solved successfully by designing the responding HGA computer program.
提出了生产管理中一类排序问题的数学模型并设计了有效的混合式遗传算法求解程序。
Hull curved block spatial scheduling problem was divided into a series of block sequencing problems and block packing problems by means of decomposition strategy.
基于分解策略,将船体曲面分段空间调度问题划分为一系列分段排序和分段填空过程。
Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.
大多数一般的多于两台机床的流水车间作业排序问题均属于NPC问题,在实际生产中一般采用启发式算法。
Job sequencing and job plan problem are general problem in service, carrying trade and all kinds of enterprise producing.
作业排序与作业计划是服务业、运输、科研以及各种企业生产中普遍遇到的问题。
In this paper, the problem for contract processing sequencing with penalty factor is studied and a branch and bound method for this problem is proposed.
本文研究了具有惩罚因子的合同加工排序问题,提出了相应的分枝定界算法。
Directed towards the sequencing diagnosis problem in the system maintenance, the generic description of the system is presented.
针对系统维修中的顺序诊断策略问题,给出了问题的一般描述。
Nanopore sequencing is expected to be much cheaper because it gets around the main problem that has kept the cost of conventional methods so high.
由于纳米孔测序客服了传统方法中最耗费开支的技术问题,所以会廉价很多。
The high-throughput genome sequencing has a phase problem, i. e. "exceeding" or "delaying", which appears in the order of bases synthesizing.
边合成边测序的高通量基因测序技术存在一个相位问题,即碱基合成的先后顺序会出现“超前”和“延迟”。
The problem of sequencing jobs with fuzzy due-dates on a single machine to maximize the degree of satisfaction among all the jobs is considered.
研究了一种具有模糊交货期的最小化全部满意度的单机调度问题。
AHP can be applied to the decision-making problem of the sequencing of power grid projects to make reasonable use of the limited funding.
层次分析法可以应用于电网工程项目排序的决策中,从而使有限的资金得到合理应用。
Ad hoc problems usually require careful reading and usually yield to an attack that revolves around carefully sequencing the instructions given in the problem.
杂项题通常需要仔细阅读题目并且需要在题目之间反复考虑,并把他们逐一运用到程序中。
Ad hoc problems usually require careful reading and usually yield to an attack that revolves around carefully sequencing the instructions given in the problem.
杂项题通常需要仔细阅读题目并且需要在题目之间反复考虑,并把他们逐一运用到程序中。
应用推荐