• The bearing capacity of two super-long piles of No. 14 pier of an extra-long bridge across Jinghang Canal are detected with self-balanced loading testing method.

    应用自平衡法对运河特大14号墩根大直径超长承载力进行检测。

    youdao

  • The bearing capacity of two super-long piles of No. 14 pier of an extra-long bridge across Jinghang Canal are detected with self-balanced loading testing method.

    应用自平衡法对运河特大14号墩根大直径超长承载力进行检测。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定